SRT-based sludge wasting

Calculator to set waste sludge flow to hit target SRT, including chemical sludge from ferric dosing.

Waste sludge production

Calculation of waste activated sludge flow. Use the simple model or include mass in the system and chemical sludge from ferric sulphate dosing.

Simple calculation

Quick estimate of waste sludge flow based on aeration volume, SRT and solids concentration.

Waste sludge flow – simple model [m³/d]

21.25

Complex calculation

Waste sludge flow including total mass in the system and optional chemical sludge from ferric sulphate.

Waste sludge flow – extended model (bio) [m³/d]

21.25

Waste sludge flow – extended model (bio + chem) [m³/d]

21.25

Chemical sludge production [kg DS/d]

0.00

Found an error? Let us know. Thank you.